DOUBLE BRANCH BRIDGE, SECTION 4.3.1.S, EGNATIA HIGHWAY, WESTERN MACEDONIA, GREECE
EGNATIA ODOS S.A.
Detailed Design of a 321m total length bridge, with 3 Spans (2x91m+1x144m), Box Girder (cantilever construction) Structural System.
|
|
|
|
NESTOS RIVER CROSSING DOUBLE BRANCH BRIDGE, EGNATIA HIGHWAY, SECTION 14.1.2, THRACE, GREECE
EGNATIA ODOS S.A.
Detailed Design of a 453m total length bridge, with 12 Spans (38m), with precast beams and in situ cast slab deck.
|
|
|
|
MAIN BRIDGES AT AGIOS PETROS-ASTROS PROVINCIAL ROAD, PELOPONNISOS, GREECE
MINISTRY OF PUBLIC WORKS
Detailed Design of 2 main bridges, 86m and 56m total length, with 3 Spans and Box Girder Structural System.
|
|
|
|
PLATANOREMA BRIDGE (C.h 260+600)
ATHENS – SALONICA HIGHWAY
MINISTRY OF PUBLIC WORKS |
|
|
|
NISSELI OVERPASSS (VERIA CITY AREA)
SECTION 6 – EGNATIA ODOS |
|
|
|
KOSKARAGA VALLEY BRIDGE
PELOPONNESE PREFECTURE (MESSINIA) |
|
|
|